Town of Plymouth: Reconstruction of Harwinton Avenue |
Plymouth, Connecticut
Project Owner/Client: Town of Plymouth
The Town of Plymouth selected Freeman Companies for the reconstruction of Harwinton Ave in the village of Terryville. This project will include roadway and storm drainage redesign of approximately one-half mile of roadway on this countryside connector. Design considerations include improvements of the horizontal alignment between Schroback Road and Ridge Road, improvements of the vertical alignment between Maggie Court and Seymour Road, traffic calming, street lighting, and guiderail repair, replacement, and installation.
Freeman Companies will also provide survey, soils and structural engineering, prepare environmental documents, and provide construction engineering and inspection services during construction. The construction cost is estimated to be $2,500,000 for this LOTCIP-funded project. Freeman Companies’ design team is taking special considerations to create budget conscious designs and provide bid alternatives to allow the Town to be flexible with their budget. |
Freeman Companies is providing the following services:
|
|